Building for Resiliency in a Floodplain
Knowing that flooding is inevitable, we moved forward with developing the Brick Works site by testing new green design features that would mitigate risk and withstand most rain events. Stormwater management ponds collect water from the central parking lot; greenways and other hard surfaces filter sediment in the water before it’s released into the Don River. We also built out the site with wet flood-proofing, which allows water to flow in and out of buildings instead of preventing it from entering. A raised floor made of Cupolex allows water, moisture, and gases to escape from beneath the floor. Elevators default to the second floor, and mechanical systems are located above the projected water level from even the most severe flood. These measures are meant to minimize damage rather than stop the flood, and they were successfully put to the test during spring floods in 2012 and again in 2013.